USE OF SHACKLE

Jan 09, 2019
Industry Information
Back to list

SCREW PIN

USE WHEN PICKING AND PLACING A LOAD, TIGHTEN PIN PRIOR TO EACH LIFT.

USE SCREW PIN SHACKLES WHEN IT WILL BE A TEMPORARY CONNECTION.


BOLT TYPE

USD IN PERMANET OR LONG-TERM INSTALLATIONS, ALWAYS USE NUT AND COTTER.

USE BOLT TYPE SHACKLES WHEN A PERMANENT OT LONG TERM CONNECTION.


DIAMETER OF SHACKLE MUST BE GREATER THAN WIRE ROPE DIAMETER IF NO THIMBLE IN EYE.

SHACKLE MUST BE LARGE ENOUGH TO AVOID PINCHING OF SYNTHETIC SLINGS.


0